Operational · Fleet Performance
GreenWind fleet production.
Net energy yield, capacity factors and fleet status across 8 sites — 330 MW onshore operational, 510 MW under construction (Jutland 400 MW · Andalusia 50 MW · Baltic East 60 MW).
Net production
—
—
Operational capacity
—
—
Fleet net CF
—
—
Under construction
—
—
Fleet overview — all sites
Status, production and CF for selected year
| Site | Type | MW | Country | Status | COD | Net MWh | Net CF | Avail. |
|---|
Net production — 36-month history
Monthly MWh by site · Jan 2023 – Dec 2025 · stacked · dashed lines = COD events
Energy yield analysis — FY2025
Gross theoretical → availability loss → net theoretical → realized · Operational sites only
Positive écart = production au-dessus du modèle
▲ favorable
| Site | MW | Gross théorique | Perte dispo. (3.5%) | Net théorique | Net réalisé | Écart MWh | Écart % |
|---|
Monthly capacity factor — 2025
Net CF by operational site · seasonal pattern (Q1 peak, Q3 trough)
Operational commentary
Model notes & caveats
- Production model (historical actuals): MWh = MW × CF_target × 730h × availability × seasonality × noise(±5%). CF_target = 28% onshore / 45% offshore — uniform across sites, calibrated on a European fleet average. No site-specific wind resource differentiation in the actuals generator; resource variance between sites is modelled in the forecast engine from 2026 onward.
-
Energy yield cascade: The table above shows a 2-factor cascade (gross → availability → net).
The full IEC 61400-15 5-step cascade (wake losses, technical losses, availability, curtailment, degradation)
is applied in the forward-looking model using site-specific assumptions from
site_operational_assumptions.csv. - Availability: 96.5% uniform for all operational sites, all periods. Planning assumption — not derived from maintenance logs or turbine-level SCADA data. In a live system, availability would vary by asset age, O&M contract scope, and grid curtailment events.
- Under-construction sites: Andalusia (S05, 50 MW, COD 2027), Jutland Offshore (S07, 400 MW, COD 2028), Baltic East (S08, 60 MW, COD 2026) show zero production. CapEx and construction financing are tracked on the Cash & Debt page.
- No revenue allocation by site: Revenue is recorded at entity level (E_FR owns S01+S02+S03). Site-level P&L can be approximated as MWh × capture_rate × baseload_price but is not derived from the GL. See Financial Performance for entity-level P&L.